R24-324 1 RESOLUTION NO. R24-324 2 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOYNTON 4 BEACH, FLORIDA, APPROVING TASK ORDER NO. GESUT-1C-02-25 5 WITH CDM SMITH, INC., FOR RISK ASSESSMENT AND 6 PRIORITIZATION FOR REPAIR AND REPLACEMENT PROJECTS FOR 7 WATER DISTRIBUTION,SEWER COLLECTION,AND STORMWATER FOR 8 AN AMOUNT NOT TO EXCEED $231,700; AND FOR ALL OTHER 9 PURPOSES. 10 11 WHEREAS, the City Entered into a General Engineering Consulting Services Agreement 12 with CDM Smith, Inc. ("Consultant"), approved by Resolution No. R24-291; and 13 WHEREAS, the Comprehensive Risk Assessment of our underground utility assets, 14 including water, wastewater, and stormwater system project aims to evaluate the current 15 condition, identify potential risks and vulnerabilities, and develop a risk of failure and consequence 16 of failure matrix. Mitigation strategies are also recommended to ensure the resilience and 17 reliability of the City's utility infrastructure. The scope includes, but is not limited to, physical 18 inspection, data analysis, risk modeling, and the formulation of recommendations for risk 19 management and improvement plans.The City desires to receive a report as a deliverable showing 20 the methodology, assumptions, and data collection information as well as ROF and COF matrix 21 and prioritization recommendations; and 22 WHEREAS, the City Commission, upon the recommendation of staff, has deemed it in the 23 best interests of the City's citizens and residents to approve Task Order No. GESUT-1C-02-25 with 24 CDM Smith, Inc., for risk assessment and prioritization for repair and replacement projects for 25 water distribution, sewer collection, and stormwater for an amount not to exceed $231,700. 26 27 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF BOYNTON 28 BEACH, FLORIDA, THAT: 29 SECTION 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 30 being true and correct and are hereby made a specific part of this Resolution upon adoption. 31 SECTION 2. The City Commission of the City of Boynton Beach, Florida, does hereby 32 approve Task Order No. GESUT-1C-02-25 with CDM Smith, Inc., for risk assessment and 33 prioritization for repair and replacement projects for water distribution, sewer collection, and 34 stormwater for an amount not to exceed $231,700 (the "Task Order"), in form and substance 35 similar to that attached as Exhibit A. 36 SECTION 3. The City Commission of the City of Boynton Beach, Florida, hereby 37 authorizes the Mayor to execute the Task Order. The Mayor is further authorized to execute any 38 ancillary documents necessary to accomplish the purposes of this Resolution. 39 SECTION 4. The City Clerk shall retain the fully executed Task Order as a public record 40 of the City. A copy of the fully executed Task Order shall be provided to Dr. Kalkat to forward to 41 the Consultant. 42 SECTION 5. This Resolution shall take effect in accordance with law. 43 44 PASSED AND ADOPTED this \-1 day of E' CY1�Q�� 2024. 45 CITY OF BOYNTON BEACH, FLORIDA 46 YES NO 47 Mayor—Ty Penserga ✓ 48 49 Vice Mayor—Aimee Kelley e_,\� 50 51 Commissioner—Angela Cruz ✓ 52 53 Commissioner—Woodrow L. Hay +� 54 55 Commissioner—Thomas Turkin 56 57 VOTE -D 58 ATTEST: Tammy L. Stanzione 59 Aaf \I j Maylee De Je• s, MPA, Mft4C1 Ty •- v-ga 62 City Clerk Mayo, 63 _ ` 64 �'�F B0Y/vec t APPROVED AS TO FORM: %', 65 (Corporate Seal) •••c°RPORq•2 '4 SE F:; l AaendoCeimi66 % ULA 68 �� % 167 92Q Shawna G. Lamb 69 �� ,c'••••..••••• City Attorney `��40RIDA Form of Task Order CITY OF BOYNTON BEACH General Engineering Consulting Services Task Order Task Order No. GESUT-1C-02-25 Consultant: CDM Smith Inc. 1. Task/Project. Risk Assessment and Prioritization for Repair and Replacement Projects for Water Distribution, Sewer Collection and Stormwater 2. Detailed Scope of Professional Services. A detailed scope of services under this Task Order, in accordance with the phases of service detailed in the Agreement, is attached as Exhibit A. 3. Deliverables and Schedule. For study/design related services: Consultant shall deliver to the City the deliverables specified at the time indicated on the attached Exhibit A. For project administration services: Consultant shall provide project/construction administration services in accordance with the Agreement and project schedule. 4. Compensation. The total estimated construction costs of the Project or the cost of the study or report for this Task Order may not exceed the amounts set forth in Section 287.055, Florida Statutes. The total Fee to be paid to the Consultant under this Task Order shall not exceed $231,700 , based on the hourly rates currently in effect under the Agreement. A detailed fee schedule is attached as Exhibit 1. The payment schedule (based on deliverables) is attached as Exhibit 1. 5. Agreement Reference. This Task Order shall be performed under the terms and conditions described within the General Engineering Consulting Services Agreement, dated November 19, 2024 , by and between the City of Boynton Beach and CDM Smith Inc. ("Consultant"), Contract No. CW24-001. 6. Insurance. Consultant shall maintain insurance coverages in accordance with the Agreement and hereby confirms that Certificate(s) of Insurance evidencing current policies meeting the requirements of the Agreement are on file with the City as of the date of this Task Order. 7. Exhibits. All attached Exhibits are incorporated fully into this Task Order and the Agreement. RFQ CW24-001 General Engineering Consulting Services Task Order Form Exhibit A 8. Notice to Proceed(Task Order Form and Purchase Order). ® If checked, Consultant's receipt of a fully-executed copy of this Task Order and Purchase Order (PO) shall serve as the Notice to Proceed under this Task Order, effective as of the date the fully-executed Task Order was emailed to the Consultant. If checked, Consultant shall commence Services under this Task Order as specified in a forthcoming Purchase Order (PO) and Notice to Proceed. CONSULTANT: CITY OF BOYNTON BEACH By: AI , By: __ zy•Penserga, May Print am. : Suzanne Mechler Date: November 21 12024 Date: \O( — \i , 20 '19 City Attorney's Office Approvid¢r as to for d I gality By: G) iW/Jd F61/174, RFQ CW24-001 General Engineering Consulting Services Task Order Form Exhibit A , °f • . k , City of Boynton Beach Risk Management Department INSURANCE ADVISORY FORM Under the terms and conditions of all contracts, leases, and agreements, the City requires appropriate coverages listing the City of Boynton Beach as Additional Insured.This is done by providing a Certificate of Insurance listing the City as"Certificate Holder"and"The City of Boynton Beach is Additional Insured as respect to coverages noted."Insurance companies providing insurance coverages must have a current rating by A.M. Best Co. of"B+"or higher. (NOTE:An insurance contract or binder may be accepted as proof of insurance if a Certificate is provided upon selection of vendor.)Thefollowing is a list of types of insurance required of contractors, lessees, etc., and the limits required by the City: (NOTE: This list is not all inclusive, and the City reserves the right to require additional types of insurance, or to raise orlower the stated limits, based upon identified risk.) • TYPE (Occurrence Based Only) MINIMUM LIMITS REQUIRED General Liability General Aggregate $ 1,000,000.00 Commercial General Liability Products-Comp/Op Agg. $ 1,000,000.00 Owners & Contractor's Protective (OCP) Personal & Adv.'Injury $ 1,000,000.00 Asbestos Abatement Each Occurrence $ 1,000,000.00 Lead Abatement Fire Damage (any one fire) $ 50,000.00 Broad Form Vendors Med. Expense (any one person) $ 5,000.00 Premises Operations Underground Explosion &Collapse Products Completed Operations Contractual Independent Contractors Fire Legal Liability Professional Liability Aggregate $ 1,000,000.00 Automobile Liability Combined Single Limit $ 1,000,000.00 Any Auto All Owned Autos Hired Autos Non-Owned Autos Excess Liability Each Occurrence to be determined Umbrella Form Aggregate to be determined Worker's Compensation Statutory Limits Employer's Liability Each Accident $ 1,000,000.00 Disease, Policy Limit $ 1,000,000.00 Disease Each Employe, $ 1,000,000.00 Property: Homeowners Revocable Permit $ 300,000.00 Builder's Risk Limits based on Project Cost Installation Floater Limits based on Project Cost Other-As Risk Identified to be determined INSURANCE ADVISORY FORM Insurance Advisory EXHIBIT A CITY OF BOYNTON BEACH, FL TASK ORDER NO. GESUT-1C-02-25 RISK ASSESSMENT AND PRIORITIZATION FOR REPAIR AND REPLACEMENT PROJECTS FOR WATER DISTRIBUTION, SEWER COLLECTION AND STORMWATER RFQ NO.: CW24-001—GENERAL ENGINEERING CONSULTING SERVICES AGREEMENT SCOPE CATEGORY "C" 11/18/2024 This Task Order(TO), when executed, shall be incorporated in and become part of the Agreement for Professional Services between the City of Boynton Beach (CITY) and CDM Smith Inc. (VENDOR), dated July 16, 2024, hereafter referred to as the Agreement. BACKGROUND The purpose of this project is to assist the CITY in refining their approach to horizontal pipeline asset prioritization for further inspection, renewal and replacement work. The CITY desires to complete a risk assessment of its water, wastewater and storm water assets to evaluate quantitatively and qualitatively the risk failure by asset, and to develop a risk matrix.Additionally,the CITY would like to develop a decision-making process and prioritization criteria for repairs, rehabilitation, extending life of the asset by lining or other means or replacement of the asset.This project will apply a desktop prioritization analysis approach to the CITY utility systems listed below leveraging the CITY's geographic information system (GIS) and other asset data and using software owned and operated by the VENDOR to perform the analysis described in this Task Order for the following CITY utility system assets: • Water distribution and transmission pipelines • Wastewater collection and trunk pipelines • Stormwater collection system pipelines Pipeline end assets connected to the pipelines will be prioritized based on the risk-based scoring of the pipelines that flow into or out of them depending on the system flow shown in the CITY GIS database. SCOPE OF WORK The following is a description of the VENDOR services to be provided under this Task Order(TO): Task 1.0—Desktop Prioritization Criteria Development Subtask 1.1 Initial Prioritization Factor Workshop VENDOR will conduct a meeting with key project leaders and end-user stakeholders. This meeting will be held at CITY's office and attended in person by local VENDOR staff and via Microsoft Teams by non-local VENDOR staff. During this meeting, VENDOR will present an initial recommended pipeline prioritization data process approach for the desktop prioritization process. The VENDOR will present and describe a 1of7 list of consequence of failure (COF) and likelihood of failure (LOF) factors for use in the desktop prioritization process for each asset type. During the workshop, VENDOR and CITY staff will develop and mutually agree on the factors to be included in the process as well as the relative weighting values to be applied to the factors to account for differences in the importance of the factors affecting the COF and LOF of potential pipeline asset failures. A second workshop held under Task 1.3 below will verify alignment of factors and weights with provided CITY Staff input. Subtask 1.2 Utility Pipeline Asset Data Review VENDOR will perform a review of the utility system data available in the CITY's GIS database and will document the amount of missing or potentially erroneous attribute data for further review by CITY staff. The unique asset identifier codes will be reviewed for their suitability to support the prioritization process and a number of GIS database quality control checks will be performed by the VENDOR to identify any structural issues that could potentially impact the spatial and other analyses to be performed during the prioritization process.The CITY will extract and provide its Accel/Adapt tool data for analysis of potential useful information that can be applied to risk assessments. The results of the data review will be documented in a technical memorandum and GIS data layers containing the records that have issues will be provided to the CITY for further evaluation or correction in the GIS prior to beginning Task 2.0. Subtask 1.3 Prioritization Factor Review Workshop VENDOR will conduct a meeting via Microsoft Teams with key project leaders and end-user stakeholders to review the final list of risk factors and weights to be used as well as the best available data sources identified to support each of the factors. A final list of potential risk factor data sources will be developed and agreed upon during this workshop and CITY staff will begin collecting the available information managed by the CITY to be provided to the VENDOR. VENDOR staff will gather risk factor information from other publicly available sources such as county, state and federal GIS database warehouses.The final set of risk-based prioritization factors will be documented as part of the Task 4.0 Final Report. Task 2.0—Data Gathering and Review VENDOR will gather from CITY an updated copy of available GIS data layers that have been modified per the recommendations made during Task 1.0 based on the recommendations from Subtask 1.2. VENDOR staff will coordinate with CITY staff to gather the CITY and other agency data noted in the Task 1 including database tables and GIS layers critical to the population of the risk-based prioritization factors identified during Task 1.0. VENDOR staff will then review the data collected to verify they are appropriate for use in populating the risk-based prioritization calculations during Task 3.0 of this scope of services. Data issues will be discussed with CITY staff via a Microsoft Teams web-based meeting to determine potential modifications or workarounds for each issue identified. Task 3.0—Desktop Prioritization Development During this task, VENDOR staff will implement the likelihood and consequence of failure factors identified during Task 1.0 utilizing data collected and reviewed during Task 2.0. The factors and risk- based analysis will be performed for the utility pipeline systems using VENDOR's copy of AquaTwin' software from Aquanuity. VENDOR staff will load the risk factors with the data and perform an initial risk-based prioritization run. 2 of 7 VENDOR and CITY staff will hold a virtual workshop via Microsoft Teams to review the results and determine if refinements are desired or needed. VENDOR will refine the risk-based prioritization model one time based on CITY staff comments. A sensitivity analysis will be performed on the factors for each asset type to illustrate how changing the weightings can affect the outcome of the prioritizations and the results shared with the CITY in the workshop. Additional refinements, if required, can be performed under Task 5. The results of this analysis will be documented in the Task 4.0 Report including recommendations regarding the amount and location of specific potential pipeline inspections and replacements based on the prioritization results. The results of the prioritization process, including individual factor and final total likelihood and consequence of failure results, will be provided in a GIS database format that can be linked to and used within the CITY's GIS during and after the completion of this project. Instructions on the use of this data file within the GIS system will be provided. Task 4.0—Final Report and Data Delivery VENDOR will document the risk-based prioritization factors used in the analysis, the results of the analysis and the recommendations regarding the potential locations and types of potential work to be performed on the pipeline assets in a final report as part of this task. The report will include the development of final recommendations regarding the yearly volume and potential candidates for work over the next 5- and 10-year timeframes. VENDOR will address CITY comments on the draft report and submit the final project report including the final GIS results database(s). Task 5.0- Data Visualizations VENDOR staff will create an interactive map with a dashboard in Esri ArcGIS Dashboards or Microsoft PowerBl so the prioritization scores can be viewed by geographic area and asset type and the data is accessible to the CITY for continued assessment of the system allowing CITY planners to perform data driven decisions now as well as in the future. Task 6.0—Assistance Allowance VENDOR staff will work, as requested by CITY, to perform other requested related tasks (i.e., gather and populate missing or suspect data identified, guide, oversee, consult, and/or perform data development work) where necessary as the CITY desires.This Task is on an as-needed basis. The work may require a mix of both Senior GIS Professionals and GIS/CAD Support Services staff trained in this type of work. Task 7.0- Project Management, Meetings, and Quality Management VENDOR will perform administrative and project management activities throughout the project consistent with VENDOR's quality management program and CITY's requirements. Specific activities included are identified below: Subtask 7.1 Project Management VENDOR will perform administrative and project management activities throughout the project consistent with VENDOR's quality management program and CITY's requirements. Project management will include maintaining lines of communication and project coordination, monthly financial performance monitoring of the budget and status reports, reporting schedules, technical conference calls, managing technical project resources, and maintaining quality control. 3 of 7 Subtask 7.2 Meetings The VENDOR will attend up to thirteen (13) meetings with the CITY.The VENDOR will prepare meeting minutes for documentation purposes. The proposed meetings include: • One (1) project kickoff meeting with CITY staff • Two (2) meetings to identify and finalize the risk factors desired • One (1) meeting to discuss the results of the Task 2.0 data gathering and review • Two (2) meetings to review the draft and final risk-based prioritization data processing • One (1) final meeting to review the comments of the draft final report. • Six (6) (approximately bi-monthly) brief, virtual project progress meetings Subtask 7.3 Project Quality Technical Review The VENDOR maintains a quality management system (QMS) for CITY projects performed by VENDOR. Technical reviews of deliverables are budgeted for and will be performed to review various milestone submittals. ASSUMPTIONS The services defined in Tasks 1.0 through 7.0 are based upon the following assumptions: 1. The CITY will provide data, support, and reviews as identified above, including existing GIS databases, available past pipeline condition information in digital format, past work order data and other data pertinent to the project identified during Task 2.0 that are owned by the CITY. 2. VENDOR will utilize available data from CITY and other sources to populate the risk factors and will identify limitations in the datasets but will not perform updates or edits to any of the datasets, unless approved by CITY, prior to their use in the risk analysis. 3. VENDOR will provide the results of the analysis in an Esri GIS geodatabase format and will perform the analysis using a copy of AquaTwin' software owned by VENDOR and will not provide this or any software to the CITY as part of this project. 4. Physical inspection of CITY's water, wastewater and storm water pipeline assets by VENDOR is not included in these services. S. The proposed schedule assumes the required data is provided by the CITY within the time periods allotted. 6. All work will be performed at VENDOR's offices and meetings will be remote using Microsoft Teams web-meeting technology with local VENDOR staff attending in person when appropriate. DELIVERABLES BY TASK The following deliverables will be provided: 4 of 7 • Subtask 1.1— Factor Workshop o Matrix of chosen and revised LOF/COF factors and weightings by asset type. • Subtask 1.2 - Data review TM o List of missing or erroneous data for CITY action o List of database structure issues o List of data quality control checks performed and results of the checks • Subtask 1.3—Prioritization Workshop o Final list of risk factors and weights by asset • Subtask 2.0— Data Review o Electronic meeting notes of data issues o List of action items for resolution • Subtask 3.0—Desktop Prioritization o Workshop notes on initial prioritization results o Sensitivity analysis results by asset type o Action items for resolution • Subtask 4.0—Report and Datafile o Draft report documenting the prioritization process and results and recommendations for: • Annual volume of R&R work recommended for each asset type • Identification of potential candidates for work for a 5-and 10-yr timeframe to lower asset risk • Planning-budget level cost opinions of the work for the two timeframes • Updated GIS database and pipe risk data fields • Instructions on the use of the risk data file within the GIS system will be provided. • Interactive map and linked dashboards o Final report incorporating applicable CITY comments • Subtask 5.0—Data Visualizations o Dashboard template file(s) in ArcGIS Dashboards or Microsoft PowerBl • Subtask 6.0— Deliverables to be determined depending on assignments • Subtask 7.0— Project Management o Meeting minutes and action items lists as identified above o Monthly Invoices and Status Reports TIME OF COMPLETION/SCHEDULE It is anticipated that the project will take 11 months to complete, starting within two weeks of receipt of a formal notice to proceed (NTP) and purchase order receipt (PO). VENDOR will prepare an updated 5 of 7 detailed schedule within the first fifteen (15) calendar days after Notice to Proceed. The anticipated schedule for each Task is as follows: • Task 1.0: within 3 months from NTP • Task 2.0: within 1 month after data for Task 2.0 are received from CITY • Task 3.0: within 5 months after completion of Task 2.0 • Task 4.0: within 2 months after completion of Task 3.0 • Task 5.0: within two months of completion of Task 3.0 • Task 6.0: As needed and requested by CITY • Task 7.0: Throughout the life of the project PAYMENT AND COMPENSATION The VENDOR will provide Task 1.0-Task 7.0 services for a not-to-exceed fee of$231,700. Not-to-exceed invoices will be submitted monthly for the VENDOR actual labor hours at contractual billing rates in accordance with the terms of the Agreement.The CITY will be invoiced for actual work completed by the VENDOR. Written monthly status reports will be provided with each monthly invoice. Exhibit 1 provides a Budget Summary. 6 of 7 Vet DIT 1 RISK ASSESSMENT AND PRIORITIZATION FOR REPAIR AND REPLACEMENT PROS ECTS FOR WATER D6TRIDUTION,SEWER COUICTION AND STORMNATER CITY OF DOYNTON REACH RFQ NO.:CW 24-001-GENERAL ENG INEERING CONSULTING SERVICES AGREEMENT SCOPE CATEG ORE"C" Task Order No.GESUT-LC-02-25 Budget ProTask PrincipalPAN HR Sr. GS Enjn ter Designer Clerical Total Other area Dela lotion ($300) nater Engineer Saco Yst (52001 (51901 151301 MOS rs Total Labor Costs Total No. (5220) 15260) 152001 HR Mr5 Mrs Mrs Mrs Mrs Mrs Mrs 5 S $ 1 Desktop Priortization Criteria Development 16 6 124 146 531,280 531,180 2 Data Gatherrigand Review 20 2 132 154 $32,960 $32,960 3 De9ttop Priortizaton Development 58 6 200 264 559,080 $59,080 4 Finer Report and Data Delivery 40 12 120 6 178 540,140 540,140 5 DataVsual¢atiors 16 6 46 68 515,680 $15,680 6 AssstanceAlowatoe 16 8 80 104 523,040 523,040 7 PNr1 n emertt,Meet ngs,andQtskty 16 62 16 32 116 529.520 $29,520 anagement Tett Project Cost,MME 182 102 0 718 0 0 3B 1040 $0 $231.7110 7 of 7