R09-045 II I 1 RESOLUTION NO. R09- otf6 2 3 A RESOLUTION OF THE CITY COMMISSION OF 4 THE CITY OF BOYNTON BEACH, FLORIDA, 5 AUTHORIZING THE CITY MANAGER TO EXECUTE 6 TASK ORDER NO. U09-07 WITH DCR ENGINEERING 7 SERVICES, INC., THROUGH RFP #037-2821-07/CJD 8 "SCADA AND TELEMETRY SYSTEM GOODS AND 9 SERVICES" FOR A TOTAL APPROPRIATION OF 10 $1,157,258.58; AND PROVIDING AN EFFECTIVE 11 DATE. 12: ! 13 14 WHEREAS, the purpose of this Task Order is to complete the change of the 15 remaining 60 pumping stations to the new telemetry system, and the separation of the raw 16 water well telemetry to a dedicated radio frequency which will provide sufficient bandwidth 17 to enable flow data to be received centrally; and 18 WHEREAS, the second element is to work on the security of our SCADA 19 information networks; and 20 WHEREAS, the City Commission of the City of Boynton Beach upon 21 recommendation of staff, deems it to be in the best interest of the citizens of the City of 22 Boynton Beach to authorize the City Manager and City Clerk to execute Task Order U-09-07 23 in the amount of $1,102,151.03, plus a 5% contingency of $55,107.55, for a total budget 24 appropriation of $1,157,258.58, with OcR Engineering Services, Inc., for RFP #037-2821- 25 07/CJD 'SCADA and Telemetry System Goods and Service." 26 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF 27 THE CITY OF BOYNTON BEACH, FLORIDA, THAT: 28 Section 1. The foregoing "Whereas" clauses are hereby ratified and confirmed as 29 being true and correct and are hereby made a specific part of this Resolution upon adoption 30 hereof. S.\CA\RESO\Agreements\Task - Change Orders\DCR Task Order U-09-07.doc II I 1 Section 2. The City Commission of the City of Boynton Beach, Florida does 2 hereby authorize and direct the City Manager and City Clerk to execute Task Order U-09-07 3 in the amount of $1,102,151.03, plus a 5% contingency of $55,107.55, for a total budget 4 appropriation of $1,157,258.58, with DcR Engineering Services, Inc., for RFP #037-2821- 5 07/CJD 'SCADA and Telemetry System Goods and Service," a copy of which is attached 6 hereto as exhibit "A". 7 Section 3. This Resolution shall become effective immediately upon passage. 3!!! 8 PASSED AND ADOPTED this _ day of March, 2009. 9 10 CITY OF BOYNTON BEACH, FLORIOA 11 p~ 12 13 14 15 16 17 18 19 20 21 22 23 C_. - 24 25 26 27 ATTEST: 28 29 30 31 32 33 34 35 S\CA\RESO\Agreements\Task - Change Orders\DCR Task Order IJ-09-07 doc Roq -otis- TASK ORDER NO. U-09-07 CITY OF BOYNTON BEACH UTILITIES DEPARTMENT 124 East Woolbright Road Boynton Beach, Florida 33435 Title of Project: RFP #037-2821-07/CJD SCADA and Telemetry Goods and Services: Wireless SCADA Phase II A. SCOPE OF SERVICES: Backe:round Over the past year, the City of Boynton Beach has upgraded and installed a new wireless SCADA infrastructure. This included the upgrade and automation of 96 lift stations, 29 wells and 2 ground storage tanks. Proiect Goals The goal of this project is to complete the installation of the remaining lift stations, ancillary controls, and communication backbone infrastructure. DELlVERABLES AND SERVICES INCLUDED: Reference the attached spreadsheet (Exhibit 1) and RFP #037-2821-07/CJD for details of the project deliverables and pricing. The scope of services has been broken down to allow easy evaluation of the individual tasks required for this project. A budgetary value has been assigned to each task and subtask to illustrate the approximate costs associated with each. The value of the task is the sum of each of its subtasks. These budgetary values are engineering estimates prior to the detailed engineering and intended for budgeting purposes. 1. Phase 2 Lift Station SCADA Replacement and Automation This subtask includes the completion of the wireless monitoring, automation, installation and commissioning of the remaining 55 duplex lift stations, 2 bypass pumps, 2 flood control pumping stations and 1 portable generator lift station. 2. Additional Inputs and Outputs at Lift Stations Furnish and Install an additional Motorola Mixed I/O module in Slot 3 of each existing 90 duplex lift station RTUs for monitoring points and future control. This will add 16 Digital Inputs, 4 Digital Outputs, and 4 Analog Inputs to each lift station. One output will be used for disabling the Backup pump controller. Additional I/O points will be assigned to generator run and fail statuses, backup pumping system status points, pressure nodes, flow meters, rain gauges and additional equipment required to be monitored. This task includes conduits and wire to existing equipment but excludes instrumentation (final elements). Task U-09-07: Page 1 of 4 3. Well Flow Monitoring Currently, well flow rates and totals cannot be monitored remotely at the water treatment plants. This task includes furnishing and installing conduits and wiring for monitoring the existing propeller flow meters on the wells in the east and west well fields. This includes 112 hours for an Electrician, and, 80 hours for a programmer for flow total and rate calculations and field installation and research at the 29 wells. This information will be used to determine the validity of the existing flow meters and the calculations will be utilized on any replacement flow meters. 4. Dedicated Well Redundant Well Field Interface Units (FlUs) Currently the wells are sharing a radio frequency with the lift station pumping system. This is limiting the amount of flow information available from the wells. This task includes furnishing and installing a single FlU with two radios at each of the two WTPs for communication with the remote wells. After setup and configuration of the FlUs, and elimination of the DFS telemetry systems, the radios at each ofthe wells will be reprogrammed to the existing DFS frequencies currently used by the old system. One frequency will be used for the east well field and the other for the west well field providing more information for required reporting. 5. Phase Monitor Revisions Currently, the phase monitor is bypassed when a station is run locally in manual or when the emergency pumping backup system is engaged. This creates a potential for single phasing and damaging pump motors in the wells and lift stations. This task includes furnishing and installing an additional phase monitor to disable the stations in both manual and during emergency high level events. Additionally, phase loss and reversal will be monitored and alarmed remotely as separate points to reduce unnecessary call outs of maintenance personnel. 6. Master Lift Station Controls Upgrades During the upgrade of the SCADA and control system, it was determined that some of the existing pump control panels do not meet NEC standards and lacked local manual operator control at the Master Lift Stations. This subtask includes manufacturing and installing new control panels with local operator controls and housings for the existing level control equipment. 7. Ground Storage Tank Upgrades During the upgrade of the SCADA and control system, it was determined that some of the existing pump control panels do not meet NEC standards and lacked local manual operator control at the Ground Storage Tanks. This subtask includes manufacturing and installing new control panels with local operator and manual controls. 8. SCADA System Training This subtask includes 120 hours of continual training of City personnel on the new SCADA Systems. Training will consist of operation, refreshers, programming, troubleshooting, maintenance, reporting and installation as determined by the City's needs. Task U-09-07: Page 2 of 4 9. Wireless Orthogon Links The East and West Water Treatment Plants provide redundant control systems between plants. The existing communication network relies on public infrastructures, is installed above ground, and does not have a redundant power source. Without the communication network, personnel would be required at each of the plants during emergency events. This subtask includes a redundant wireless link between the water treatment plants and a second link between the east water treatment plant and the City's new fire station. 10. East Water Treatment Plant Fiber Ring Installation The new control system being installed in the East Water Treatment Plant requires a new reliable, stable, and versatile communication network. This network will consist of a redundant distributed fiber ring throughout the plant and will be secondarily used for networking and video applications. The City is in the process of self performing the installation of the new conduits and fiber optic cabling. After completion, this task will include furnishing and installing the enclosures, network and fiber equipment (excluding Ethernet switch equipment), and termination of the fiber optic cables. 1I. West Water Treatment Plant Fiber Ring Extension The new antenna at the west treatment plant for the redundant fiber link will be installed on a tower provided by T-mobile. This subtask will include the enclosures, network and fiber equipment (excluding Ethernet switch equipment), and termination of the fiber optic cables into the existing redundant fiber ring at the West treatment plant. The City will self perform the installation of the new conduits and fiber optic cabling. Proiect Requirements . The City will provide a lead contact person for the duration of the project. . The City will provide full access to all necessary information required by the consultant on a timely basis. . The contractor will appoint appropriate project management and hold regular progress meetings with the City. . All reports, drawings or other such material will be provided to the City in electronic format using MS Office or Adobe Acrobat. B. SCHEDULE The final schedule for DCR Engineering Services, Inc.'s services will extend from our authorization date to 360 calendar days. Task U-09-07: Page 3 of 4 C. COMPENSATION TO THE ENGINEER For conducting the base services delineated in Section A, Task Order U-09-07 is issued based on the Agreement dated August 29, 2007; DCR shall receive the lump sum fee of $ 1,102,151.03. This fee includes all labor and other direct costs for the scope of work specified in Section A of this Task Order and are represented in Exhibit 1 and RFP #037-2821-07/CJD. In the event additional work efforts are requested by the City, which are beyond the scope of work identified in Section A of this Task Order, the compensation to the engineer will be negotiated separately from this scope. Partial payments of the lump sum fees are to be paid to DCR on a monthly basis in proportion to the percentage of work completed and materials received. AMOUNT AUTHORIZED FOR TASK ORDER NO. U-09-07 $ 1.102.15I.03 Submitted By: jA.-- Todd B edbenner, P.E. President, DcR Engineering Services, Inc. CITY OF BOYNTON BEACH, FLORIDA Approved By: Kurt Bressner City Manager Approved as to Form: Attestl Authenticated: Office of the City Attorney Secretary Task U-09-07: Page 4 of 4 C. COMPENSATION TO THE ENGINEER For conducting the base services delineated in Section A, Task Order U-09-07 is issued based on the Agreement dated August 29, 2007; DCR shall receive the lump sum fee of $ 1,102,151.03. This fee includes all labor and other direct costs for the scope of work specified in Section A of this Task Order and are represented in Exhibit 1 and RFP #037-2821-07/CJD. In the event additional work efforts are requested by the City, which are beyond the scope of work identified in Section A of this Task Order, the compensation to the engineer will be negotiated separately from this scope. Partial payments of the lump sum fees are to be paid to DCR on a monthly basis in proportion to the percentage of work completed and materials received. AMOUNT AUTHORIZED FOR TASK ORDER NO. U-09-07 $ 1.102,151.03 Submitted By: j.A-- Todd B edbenner, P.E. President, DcR Engineering Services, Inc. CITY OF BOYNTON BEACH, FLORIDA Appmved BY:~ ~~~ -fA kS Kurt Bressner City Manager Attest/Authenticated: Task U-09-07: Page 4 of 4 CITY CLERK'S OFFICE MEMORANDUM TO: Kofi Boateng, Director Utilities FROM: Janet Prainito City Clerk DATE: March 9, 2009 RE: R09-045 Task Order No. U-09-07 SCADA and Telemetry Goods and Services Wireless SCADA Phase II Attached for your handling are two (2) fully executed agreements mentioned above and a copy of the Resolution. Since the documents have been fully executed, I have retained an original for Central File. Please contact me if there are any questions. Thank you. ~m. ~ Attachments cc: Central File S:ICCIWPIAFTER COMMISSIONIDepartmental Transmittals\2008lKofi Boateng R09-045.doc